Power Point Presentation
For this project we were required to analyze some criteria parameters which had to be met by a proposed transmission line being installed across Manatee and Sarasota counties. The 4 criteria we were to analyze were, conservation areas affected, homes affected, schools affected, and length of the line itself and the cost.
The project required me to utilize all the skills and methods I have learned throughout the semester.
Overall I have thoroughly enjoyed my time in intro2GIS and look forward to using my skills I have developed on future endeavors.
No comments:
Post a Comment